PBD 2014-03C Agency accreditation scheme for construction threshold for unaccredited work

  • Board directions
Updated: 23 Jul 2014
This Direction increases the maximum value of construction work that can be undertaken by an agency that is not accredited under the Agency Accreditation Scheme for Construction (the Scheme). The maximum value is now $1.3 million.